Lab 42 — Design Together

From foggy idea to executable blueprint in 2–3 weeks. Lab 42 is our evidence-driven design phase. Every workshop, diagram and prototype is mapped to a downstream test or line of code, so nothing gets lost between "whiteboard" and "pull-request."

1 · Why design before you build?

Pain without a design phaseWhat Lab 42 eliminates
Specs drift and re-work pile upBPMN + BDD tie scope to testable outcomes.
Stakeholders talk past each otherThree-Layer modelling shows exec, ops and dev the same picture.
“Surprise” integrations blow budgetsTechnical spikes surface API / data gaps early.
Hard to choose billing modelRe-scored FCI tells us if Fixed, Pod or DaaS fits best.

2 · The Lab 42 Operating System

StepKey ActivitiesArtefacts
DiscoverStakeholder canvas • Success metricsVision map, OKR list
MapThree-Layer BPMN L1-L3Diagrams with swim-lanes
AlignGamified workshops (Octalysis)MoSCoW backlog, risk heat-map
ValidateBDD scenario writing • Low-fi prototypeGherkin suite, clickable UI
CommitFCI re-score • Budget & model recommendationArchitecture pack, SoW draft

Elapsed time: 8–15 business days (scope-dependent).

3 · Signature Methods & Artefacts

■ Three-Layer BPMN

L1 Vision – high-level value stream
L2 Business Flow – roles & swim-lanes
L3 Technical Detail – system interactions & data shapes
Marries exec clarity with developer depth.

■ Behaviour-Driven Matrix

Every BPMN task gets a Gherkin scenario; scenarios become automated tests in Sim 42.

■ Clickable Prototype

SvelteKit or Figma click-through built by Day 4; lets users feel the flow, not just read it.

■ Feature Clarity Index (FCI)

12-question rubric, scored pre- & post-Lab. Typical jump = +3.2 points.

■ Risk & Dependency Heat-Map

Traffic-light view of integration, data, security and adoption landmines; updated each workshop.

4 · Workshop Formats & Gamification

FormatDurationWhy it works
Lightning Decision Jam45 minRapid problem framing; no rabbit holes.
Octalysis-powered Prioritisation90 minGame mechanics keep energy high, consensus fast.
Design Studio Sketch-off60 minCross-functional sketches yield better prototypes.
BDD Discovery "Three Amigos"30 min chunksBA, dev, QA write tests together—zero lost intent.

All sessions can run hybrid via Miro + Gather.town.

5 · Toolchain

Miro

digital whiteboards

Camunda Modeler

BPMN L3 diagrams

Cucumber Studio

BDD repository

Storybook

live UI component workbench

GitHub Projects

backlog & sprint planning

6 · Cadence & Timeline (sample 10-day sprint-0)

DayAMPM
1Kick-off, success metricsStakeholder canvas
2BPMN L1 & L2BPMN L3 deep-dive
3Risk heat-mapPrototype sketch-off
4Clickable prototype buildUsability quick-test
5BDD discovery #1Data & API spike
6BDD discovery #2FCI midpoint score
7Cost-driver analysisBilling model workshop
8Architecture summaryDraft backlog
9Review loop & editsSign-off rehearsal
10Final sign-offHand-off to Forge 42

7 · Gate Criteria (exit = ready for build)

  • FCI ≥ 5
  • BPMN L1-L3 signed
  • ≥ 80 % user stories linked to Gherkin
  • Prototype walkthrough approved
  • Risk heat-map ≤ "amber" on all critical items
  • Budget & billing model accepted

Fail a gate? We pause, adjust or cycle Mini-DaaS before writing code.

8 · Mini Case

Insurance Onboarding Re-Design — 14-step paper process collapsed to 6 digital steps; FCI moved 3.1 → 7.8; prototype validated with 5 users in 48 h. Result: Fixed-Scope MVP delivered 30 % under initial budget range.

9 · FAQs

10 · Call to Action

Ready to turn vision into a build-ready blueprint?

Book a Lab 42 discovery call—get an agenda and fixed quote within 48 h.

Book Lab 42