How We Work → Billing Options → Sprint Pod (Time-and-Materials Cap)

Predictable agility.

A Sprint Pod gives you a reserved, cross-discipline squad that works in fixed-length sprints while never billing above a pre-agreed ceiling. It’s perfect when your Feature Clarity Index (FCI) is 5–8: you know the direction, but details still evolve.

Why Choose a Sprint Pod?

Your SituationWhat the Pod Delivers
Scope is moving but roadmap is clearContinuous delivery in two-week slices with demoable increments.
Budget holders need guard-railsHard weekly cap prevents runaway spend; burn-up charts prove value.
You need velocity fastPre-gelled team drops in with CI/CD, BDD and BPMN playbook ready to go.
Future may require Fixed or DaaSEasy up-switch to Fixed-Scope Pack (when FCI ≥ 8) or roll into Full DaaS without contract churn.

Pod Composition & Capacity

RoleFTE RangeKey Focus
Product / Delivery Lead0.5Backlog, sprint cadence, reporting
Solution Architect0.3Data, integration, non-functional design
Front-End Dev0.8–1Svelte/LWC components, UX tweaks
Back-End / Apex Dev0.8–1Django services, Apex logic, APIs
QA / BDD Engineer0.3Test automation, quality gates
DevOps / SRE0.2CI/CD, observability hooks

Typical pod size: 3.0 – 3.5 FTE. Scale ±1 FTE with one-sprint notice.

Cadence & Ceremonies

CadenceEventOutputs
Every 2 weeksSprint Planning → Demo → RetroCommitted backlog slice • Working increment • Improvement actions
MonthlySteering DayFCI re-score, budget burn, risk heat-map
DailyStand-up (15 min)Blocker surfacing, plan sync
ContinuousCI/CD PipelineStatic analysis, unit + BDD, deploy preview

All meetings are open to your stakeholders or recorded for async review.

Cap Mechanics & Budget Control

Weekly Hours × Rate → Cap

(cannot be exceeded without signed change note).

10% Flex Buffer

pre-approved in case of hot fixes; unused buffer rolls one sprint.

Real-Time Burn-Up

dashboard shows hours vs. cap, story points vs. plan.

Variance Alerts

Slack/Teams ping if forecast may breach 80% of cap.

Deliverables & Evidence

CategoryEvidence You See
Working SoftwareDeployed preview URL every sprint
DocumentationBPMN L3 diagrams & in-repo ADRs
QualityCoverage %, static-analysis score, performance bench
ForecastsVelocity trend, budget burn, risk heat-map

All artefacts migrate unchanged if you switch to Fixed or DaaS.

Governance & Transparency

  • Open Backlog — Jira/Linear access with comment rights.
  • Decision Log — scope & budget changes stamped at Steering Day.
  • Quality Gates — merge blocked if tests/coverage below threshold.
  • FCI Trend — visible chart drives model switch decisions.

Switching Pathways

TriggerRecommended MoveWhy
FCI ≥ 8 & scope frozenFixed-Scope PackLock price for remaining features.
Roadmap extends > 6 monthsFull DaaSCheaper blended rate, ops included.
Volatility ↑ (> 15 %)Stay in Pod or revert to Mini-DaaSKeeps agility without renegotiation.

Switch = new forecast, no penalty; contract umbrella already covers all models.

Commercial Terms

ItemDetail
BillingWeekly in arrears or twice-monthly, matching cap
Notice1 sprint (2 weeks) to up/down-scale or pause
IP OwnershipTransfers on payment; repo can live in your GitHub
Holiday / DowntimeNot billed; schedule aligned with sprint calendar
Rate ReviewEvery 6 months or CPI > 6 %

Sample 3-Sprint Timeline

SprintFocusKey Win
1Set up CI/CD, baseline UX shellPreview link + smoke tests live
2Core entity CRUD + authDemo handles real data end-to-end
3Integration spike + perf testAPI round-trip proven < 300 ms

After Sprint 3 the project moved to a Fixed-Scope Pack for a hard launch date.

Mini Case

Insur-Tech MVP — Sprint Pod delivered three customer journeys and two system integrations in 6 weeks, holding spend 3 % under cap. FCI climbed from 5.4 → 8.2, enabling a smooth shift to a Fixed-Scope release.

Frequently Asked Questions

Need sprint-level agility without budget anxiety?

Book a 30-minute Sprint Pod consult—get a squad lineup, cap figure and start date within 48 h.

Lock My Sprint Pod