How We Work → Billing Options → Sprint Pod (Time-and-Materials Cap)
A Sprint Pod gives you a reserved, cross-discipline squad that works in fixed-length sprints while never billing above a pre-agreed ceiling. It’s perfect when your Feature Clarity Index (FCI) is 5–8: you know the direction, but details still evolve.
Your Situation | What the Pod Delivers |
---|---|
Scope is moving but roadmap is clear | Continuous delivery in two-week slices with demoable increments. |
Budget holders need guard-rails | Hard weekly cap prevents runaway spend; burn-up charts prove value. |
You need velocity fast | Pre-gelled team drops in with CI/CD, BDD and BPMN playbook ready to go. |
Future may require Fixed or DaaS | Easy up-switch to Fixed-Scope Pack (when FCI ≥ 8) or roll into Full DaaS without contract churn. |
Role | FTE Range | Key Focus |
---|---|---|
Product / Delivery Lead | 0.5 | Backlog, sprint cadence, reporting |
Solution Architect | 0.3 | Data, integration, non-functional design |
Front-End Dev | 0.8–1 | Svelte/LWC components, UX tweaks |
Back-End / Apex Dev | 0.8–1 | Django services, Apex logic, APIs |
QA / BDD Engineer | 0.3 | Test automation, quality gates |
DevOps / SRE | 0.2 | CI/CD, observability hooks |
Typical pod size: 3.0 – 3.5 FTE. Scale ±1 FTE with one-sprint notice.
Cadence | Event | Outputs |
---|---|---|
Every 2 weeks | Sprint Planning → Demo → Retro | Committed backlog slice • Working increment • Improvement actions |
Monthly | Steering Day | FCI re-score, budget burn, risk heat-map |
Daily | Stand-up (15 min) | Blocker surfacing, plan sync |
Continuous | CI/CD Pipeline | Static analysis, unit + BDD, deploy preview |
All meetings are open to your stakeholders or recorded for async review.
Weekly Hours × Rate → Cap
(cannot be exceeded without signed change note).
10% Flex Buffer
pre-approved in case of hot fixes; unused buffer rolls one sprint.
Real-Time Burn-Up
dashboard shows hours vs. cap, story points vs. plan.
Variance Alerts
Slack/Teams ping if forecast may breach 80% of cap.
Category | Evidence You See |
---|---|
Working Software | Deployed preview URL every sprint |
Documentation | BPMN L3 diagrams & in-repo ADRs |
Quality | Coverage %, static-analysis score, performance bench |
Forecasts | Velocity trend, budget burn, risk heat-map |
All artefacts migrate unchanged if you switch to Fixed or DaaS.
Trigger | Recommended Move | Why |
---|---|---|
FCI ≥ 8 & scope frozen | Fixed-Scope Pack | Lock price for remaining features. |
Roadmap extends > 6 months | Full DaaS | Cheaper blended rate, ops included. |
Volatility ↑ (> 15 %) | Stay in Pod or revert to Mini-DaaS | Keeps agility without renegotiation. |
Switch = new forecast, no penalty; contract umbrella already covers all models.
Item | Detail |
---|---|
Billing | Weekly in arrears or twice-monthly, matching cap |
Notice | 1 sprint (2 weeks) to up/down-scale or pause |
IP Ownership | Transfers on payment; repo can live in your GitHub |
Holiday / Downtime | Not billed; schedule aligned with sprint calendar |
Rate Review | Every 6 months or CPI > 6 % |
Sprint | Focus | Key Win |
---|---|---|
1 | Set up CI/CD, baseline UX shell | Preview link + smoke tests live |
2 | Core entity CRUD + auth | Demo handles real data end-to-end |
3 | Integration spike + perf test | API round-trip proven < 300 ms |
After Sprint 3 the project moved to a Fixed-Scope Pack for a hard launch date.
Insur-Tech MVP — Sprint Pod delivered three customer journeys and two system integrations in 6 weeks, holding spend 3 % under cap. FCI climbed from 5.4 → 8.2, enabling a smooth shift to a Fixed-Scope release.